IBIS Quality Teleconference Minutes
DATE: 22 October 2002
TIME: 11-12 AM EST (8-9 AM PST)

ROLL CALL
Adam Tambone Adam.Tambone@fairchildsemi.com
*Barry Katz bkatz@sisoft.com
Benjamin P Silva benjamin.p.silva@intel.com
Bob Ross bob_ross@mentor.org
*Eckhard Lenski Eckhard.Lenski@icn.siemens.de
Eric Brock ebrock@sisoft.com
Gregory R Edlund gedlund@us.ibm.com
Hazem Hegazy hazem_hegazy@mentorg.com
John Figueroa jfigueroa@apple.com
Katja Koller (Siemens)
Kevin Fisher kfisher@sisoft.com
*Kim Helliwell kimgh@apple.com
*Lynne Green lgreen@cadence.com
*Mike Labonte milabont@cisco.com
Peter LaFlamme plaflamm@amcc.com
*Robert Haller rhaller@sisoft.com
*Roy Leventhal Roy_Leventhal@3com.com
Sherif Hammad sherif_hammad@mentorg.com
*Todd Westerhoff twesterh@cisco.com
Tom Dagostino tom_dagostino@mentorg.com
Kazuyoshi Shoji kshohji@hitachi-ul.co.jp
Sadahiro Nonoyama nonoyama@hitachi-ul.co.jp

Everyone in attendance marked by  *

Interested, but have not yet attended:
    Ralf Bruening Zuken ralf.bruening@zuken.de

NOTE: "AR" =3D Action Required.

-----------------------MINUTES ---------------------------

- Review of minutes for October 8
  Accepted as written.

- Announcements
  EIA Call for Patent Disclosure:
No companies reported any patents related to IBIS.

- AR Review
  Lynne is waiting on input for documentation.

- Meeting schedule
  Japan has requested meeting at 9 AM Japan time.  Current meeting
time of 8 AM PST is 11 AM East coast, 5 PM in Germany, 1 AM in
Japan.  Options: do nothing, select a new time, or alternate times. =20
  AR: Barry will ask Japan if 2 hours earlier would be OK.

- PCB EAST Review
  Met at SiSoft office, went through issues and added new sections to
the quality checklist.  Went through presentation for PCB East.  Had
problems with phone lines, so people may have had trouble calling in.
  AR: Barry to forward updates to Lynne.

- Documentation
  Updated list of volunteers for each section included at end of
Minutes.
  Greg Edlund has completed a draft, Mike LaBonte has a draft, Bob
has done a draft, Eckhard Lenski has done a draft.  Barry will do V-t
curves, component section.  Lynne to do the general keywords in the
[Model] section.  Todd offered to document general file requirements
include list of warnings that are acceptable, and requirement to
document any warnings that are real in the file.
  Checklist needs to indicate which version of ibischk was used on file.
  Should we require [IBIS ver] to be 3.2 or higher?  Bob Ross may
have a list of all Warnings covered by the parser.  IBIS 2.1 does not
have as many checks made as IBIS 3.2.  If IBIS 3.2 did not add any
new required keywords, then it is OK.  Noted that Level 1 requires
IBIS 3.2 features.
  Header section needs to document comment "|IQ" and how warnings
and quality of individual components and models are summarized at
top of the IBIS file.  Kim to work on this.
  Barry to document model limitations.
  AR: Bob to send Lynne list of keywords.
  AR: Todd to work with Bob Ross to get list of ibischk3 checks for
[IBIS ver] 2.1 and 3.2.
  AR: Lynne to compile what has been received so far and send to
Barry for posting.

- Opens for new items
  No new items.

- Plans for next meeting
  Details related to [IBIS ver] and ibischk versions.
  Header section.
  Formatting the documentation.
  Meeting time.

- Schedule for next meeting
  DATE: 5 November 2002
  TIME: 11-12 AM EST (8-9 AM PST)
  408-974-8478 or toll free: 800-249-5618
  CONFERENCE SERVER 2, Conference ID: 4203



Meeting adjourned at 9 AM PST.

Respectfully submitted,
Lynne Green
Cadence Design Systems, Inc.


Appendix:

* IQ Header Section - Kim Helliwell
Summarizes quality for File, all components, and all models
* General File Characteristics - Todd Westerhoff
Passes IBISCHK
Goal zero errors and zero warnings
In some cases zero warnings not possible.=20
Document known cases of acceptable warnings. =20
Document version of IBISCHK
* Component Section - Barry
- Model Section
* General - Lynne Green
* Pullup/Pulldown/Clamp IV curves - Robert Haller
* VT Curves - Barry
* Ramp Data - Mike LaBonte
* Waveform Processing requirements - Mike LaBonte
* Possible Errors that should be checked - Eckard
Categorize these entries into other buckets
* Correlation - Greg Edlund
SPICE correlation
Lab Correlation
* Model Limitations - Barry
Define standardized format for documentation

---------------------------------------------------------------------
IBIS Quality archives: http://www.freelists.org/archives/ibis-quality
To unsubscribe send an email:
  To: ibis-quality-request@freelists.org
  Subject: unsubscribe

